Power capacity

  • ~100 MW (more capacity depending on Troms DC Balsfjord activity) 
  • 132 kV Voltage (2 available switchgear cells)
  • N-0
  • Renewable energy supply

Grid

  • ~8-9 % marginal loss factor (2016–2017)
  • ~1.5 km grid line to main transformer station
  • Redundant grid point (2 lines to Bardufoss)

Area

  • Today ~15 ha = 150,000 m2
  • Zoned
  • Flat forest area with expansion potential
  • No large settlement next to site

Time to market

  • 2026. Dependent on transformer solution and final approval from Statnett/NVE.

Infrastructure

  • 40 min to Bardufoss airport (primary)
  • 75 min to Nordkraft HQ / Narvik

Fiber

  • Redundant fiber access with international dark fiber
  • Several operators (BBFT, Broadnet, Telenor and Statnett)

Climate

  • Average yearly temperature = ~2,2 celcius (Setermoen)